What are mandatory fields for PP configuration
Answer Posted / arun k
1.OPPQ-Plant Parameters
2.OPPR-MRP Parameters
3.OPJH-Creation of order type
4.OPL8-Order type dependent parameters
5.OPKP-Scheduling profile
6.CO82-Assign number ranges for orders
7.OPJ8-Control key parameters
8.OPK4-Conformation parameters
9.opjk - avail;ability check parametre
10 opu3 - scheduling dependent parametre
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is Individual and collective requirements and differecne between them in MTO scenario?
What is the transaction code to run MRP for sales order?
How is the processing time calculated in a wc when both labor, machine categories exist?
How the process time is calculated in a wc when both labour, machine categories exist?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
How the processing time is calculated in a wc when both labor, machine categories exist?
What is MTS and MTO and the difference between them?
What is purpose of schedule margin key?
What is meant by slab?
How can you get planned orders scheduled so that you can do capacity leveling ?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
How to insert an inspection checkpoint at the end of an operation?
How can I use variable size items?
Overlapping and splitting, where do you assign?
What is 'capacity planning'?