I've one slab of 24m x 43m. How to calculate required steel
For this slab.
Answer Posted / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
Length of Slab = 43M
Width of Slab = 24M
Heigth of Slab = -----(Not Given)
You can not find the quantity of reinforcement .
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
which red: used in roof teping, then use only cement
how to nfind out the specific gravity of sand.aggregate,water please help...
i need gate exam civil engineering question papers with answers
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
types of survey and levelling instrument ?
pls give me some basic informations in construction of a structure?
What is meaning of FREE STANDING STAIRCASE ?
what is the design procedure for building
What will be weight of 0.5mm GI sheet per sq.ft?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
How do we test on design and style in a software?
Explain the design for rcc multi-storied building?
What type of tensile strength is handling by crank in beam? Thanks.