What"s mean by water bound macadam road(WBM)?
Answer Posted / jahane jannat khan
The broken stones of base and surface course,if any are bound by the stone dust is presence of moisture is called WBM Roads. WBM Stands for Water Bound Macadam which is the most commonly used road construction procedure for over more than 190 years.Pioneered by Scottish Engineer John Loudon McAdam around 1820 Macadam is a type of Road Construction.
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
questions with answers to face an interview of an civil engineer regarding RCC buidings
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
What are some structures that may be subjected to fatigue?
Why are pull-out tests performed for soil nails?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
What is c.g.i sheet which used for roof??
How do we test on design and style in a software?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
Discuss some applications of modular elasticity?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
What is geopolymer based concrete?