What"s mean by water bound macadam road(WBM)?

Answer Posted / jahane jannat khan

The broken stones of base and surface course,if any are bound by the stone dust is presence of moisture is called WBM Roads. WBM Stands for Water Bound Macadam which is the most commonly used road construction procedure for over more than 190 years.Pioneered by Scottish Engineer John Loudon McAdam around 1820 Macadam is a type of Road Construction.

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

questions with answers to face an interview of an civil engineer regarding RCC buidings

2157


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5789


What are some structures that may be subjected to fatigue?

659


Why are pull-out tests performed for soil nails?

749


List out some of the software used in the construction sector to estimate cost and monitoring expenses?

713






How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

1573


What is c.g.i sheet which used for roof??

1461


How do we test on design and style in a software?

675


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2506


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

344


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

1614


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1766


Discuss some applications of modular elasticity?

753


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1309


What is geopolymer based concrete?

2149