Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / mufaddal hamdard
1.5m3 of dry material is required to get 1m3 of concrete.
and 2% or 5% is the amount of waste taken in account
1.5 + 0.02 is 1.52
or
1.5 + 0.05 is 1.55 thats it.
and now how 1.5 is derived is the question
As it is considered that when materials are mix in mixer the voids are finished after mixing and the output is 67% of the input in mixer
so
1/.67 is 1.5
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
how to calculate the length diamond shaped striupps in column
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
in the earthquqke the profile of water on dam is parabolic or not
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
what is m30 in concrete tiles
What do you mean by bond? What are the different types of bonds?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
which type of instrument included in plumbing work?name of instrument?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
what is the difference between replacement of cement by groundnut shell ash
What are the phases inspections are done by local authority while construction?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
Questions related to civil.engg in company