Answer Posted / s93381
before the plant startup check all system instrument parameter that is Pre- commissioning.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Give an example where you had aproblem on the job, and tell me how you solved the problem. and the finalvoutcome.
What types of Instrumentation Related Questions can an Interviewer ask in a Telephonic Interview ?
how to calculate signal cable sizing? and multipair cable sizing??explain in brief?
How signals can be taken through modbus?
can anyone tel the syllabus or previous year question paper for BHAVINI(EIE)2014.
why we use 3 wire rtd direct wiring for temperature measurement instead of temperature transmitter like bearing temperature
How the sizing of the analog signal cable is calculate?
how to calculate control valve bonnet size?? or how to select its material?
need to calculate flow rate with the help of dp range and orifice bore dia and size. range is 0 to 400 inwc and orifice size is 12 inch 150 # rf and bore dia is 7.180 inch. need to calculation for flow rate
Draw a great bridge circuit.
How will you calibrate PID controller? explain with example.
while i check zero check for dp flow transmitter some fluctuating came (0 to 458 kg/h) what is the reason?
Explain signal isolator
how many type of plug are used in pneumatic control valve,name them.
what is the procedure of belt scale calibration?