Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the quantity for masonry(block and plaster)?

Answer Posted / mohammed tausif

a) Wall plastering in CM 1:4 of 12 mm thick for 100 m2:-

Volume = 100 x (12/1000) = 1.20 m3
Add 30 to 35% as bulking of sand = 0.36 m3
Add 20 as wastage of sand = 0.312 m3

Total = 1.872 m3

= (1.872/1+4) = 0.374 m3

Cement = 0.374 x 30 = 10.77 bags
Sand = 0.374 x 4 = 1.496 m3

b) For 100 m3 of solid Block masonry in CM 1:6 mix 8” thick:-

Volume = 100 x 0.2 (Thickness of wall)
= 20 m3

No. of blocks required = 20/(0.4 x 0.2 x 0.2)
= 12502 No’s

Volume of mortar = 20-{0.39 x 0.19 x 0.19 x 1250}
= 20 – 17.598 = 2.40 m3

Note: 200mm – 10 mm for mortar thickness = 190 mm
Blocks =17.598/(0.4 x 0.2 x 0.2) =1100 No’s

Add 2% wastage = 22
Total = 1122 No’s
Increase by 25% for dry mortar = 3 M3

= 3/ (1+6) = 0.429 M3

Cement = 0.429 x 30 = 12.50 bags
Sand = 0.429 x 6 = 2.57 M3
Blocks =1122 No’s

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the responsibilities of a construction manager?

1294


five requirements of infill panels for walls?

3713


in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?

1977


Rate analysis of Vitrified tile in cement mortor 1:3

4461


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1801


explain the rale of the government in the construction industry

2386


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2100


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2712


what is the difference between replacement of cement by groundnut shell ash

3188


can stub column take the load as main column

1896


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

2295


is basic cost of the material includes tax?

2089


How do you change a dimension value in solidsworks?

1221


What is rate of concrete surface rendering work per sqm

1990


What are the different approaches in designing the floors of the service reservoirs?

1164