how shall you calculate PLF on the basis of percentage auxillary load factor

Answer Posted / ramakrishna karri

ratio between average load to peak load in a specified time period. high Load factor means plant running consistently is good.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers