how shall you calculate PLF on the basis of percentage auxillary load factor
Answer Posted / ramakrishna karri
ratio between average load to peak load in a specified time period. high Load factor means plant running consistently is good.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
can dp type level transmitter work in under vaccum condition
What is LB-SR.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
what is the difference between compensated & normal drum level in boiler drum?
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
LAPT working in alternator / generator
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
procedure of how to generate power in solar plant.
How do you consider that you can improve and what assistance do you need to achieve this
what is the meaning of SST300 V56A in SIEMENS turbine
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what is restricted earth fault explain in details
What is difference between secondary Air & Tertiary Air and Their use.?
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.