Answer Posted / nknehru
The minimum thickness of PCC 1:4:8 is 50 mm for RCC road works
Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
how can we calculate steel value, depending on load
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is the weight of 6000 psi concrete in lb/cft?
length where bent up is made in slab of bridge from one end
What is meant by engineering drawing?
what is the maximum number of course that can be laid according to IS code and the max height.
what is SDLC ?and write a 'c'program for to swapping the three numbers?
what discoveries did you have in relation to your course?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
How to find out slope footing concrete
how can calculate cutting length of diamond ring
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
How can you achieve soil enforcement?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.