Answer Posted / narayan
Raft thickness-top and bottom cover-top reinfo-bottom main reinfo
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
what else we can add rather than admixture in concrete to reduce the cement quantity?
How to calculate carrying capacity of the existing water supply trunkmain
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
How to determine thee cut length for steel reinforcement bars in R.C.C design
What is an object snap mode?
What is the development length given in pile?
why +1 to be followed for calculating the no of bars in BBS. Please explain
How many square meter can mason layout chb per hour
States some of the commonly used commands in cad software’s?