Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to find under ground cable fault ???
if our cable size is 95*4 then what will load capacity
with far mull

Answer Posted / pas

Disconnect the both side cable.after disconnect the cable check by meager meter.meager one lead for earthing second lead for conductor.reading show in mega ohm.if cable was short reading reading showing infinity.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How Diesel Generator start ?

2396


importance of reactive power management

2014


i need about 10 years of GATE solved papers in pdf format and even mock tests toooo

1654


how generator load test is conducted?what are the steps?

1583


Briefing the effects of ASR and ACR of a double closed-loop speed regulating system.

2230


What is the different between conventional MCC and intelligent MCC? Common controller or controller for each bucket

1052


Brief working principle of stabilizer,application & safety precautions

5659


How to test Alternator stability test for REF relay

1463


1)Explain why the cradle guard is used on railway crossing in overhead line construction?

5037


how technical is calculated in 11kv line and lt line

2030


what is meant by neutral compensation factor and where it is used

1894


i have install 750 kva distribution transformer at my site and want to do neutral earthing. what calculations should i follow to determine earthing conductor material and size?

2039


Convert a star connected network into a delta connected network.

1103


WHERE NEUTRAL WIRE IS CONNECTED AT DOMESTIC TO TRANSMISSION LINE(SINGLE PHASE TO THREE PHASE)

1817


What is a surge supressor why its is used in synchronous generators

1995