what is periode of deshuttering for different area of slab
Answer Posted / benny joseph
Solid slab 30cm thick x 1000 m2 deshuttering shall be how many days of after casting ( slab mix opc 380kg) 7days curing
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
brickwork labour rate per cum ?
Which IS Code/American Code applied for coupler test of steel
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
why we can use dust in concrete insted of fly ash
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
Can inverted beams used in pipes during construction?
what do you know that m20,m25
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
can any one explain bar bending schedule of bems and columns and slabs ??
What are the applications of modulus of elasticity?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
What is the quantity of cement in mix m20 concrete?