Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much standard bricks required for a wall of 9*1200*1200 inches

Answer Posted / biplab sinha

Vol. of wall - (9/12)x(1200/12)x(1200/12) cum = 7500 cft

1 cft = 35.28 cum so vol. of wall = 7500/35.28 cum = 212.58 cum.

For standard first class brick 1 cum = 500 nos of bricks

Therefore total bricks required = 500x212.58 nos = 106293 nos

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1855


what mean By core Billing

2367


how can calculate cutting length of diamond ring

1900


How to hide dimensions in autocad?

1242


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

2185


What is gravity flow?

1262


How do we determine the specific gravity of a cement?

1162


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

2129


what are RIB slabs explain about it

2685


I want to join bhel because

2248


What are the advantages and disadvantages of using plastic and timber fenders?

1210


How to fix toll charge for a particular vehicle at toll booths in a highway?

2043


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

2079


How many % we consider for lap for reinforcement for estimates

1870


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

2576