Can any one understand me if a water boring is done for 22 feet it's width is 10 inch.. Then how much ltr. Water will be in the bore
2πr2h
22/7 x 5x5 x 22
Volume is 1728.57
1728.57 is ltr or mltr.
Kindly explain
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
how to caluclate sienerge qty in construction in ap
how to calculate MR 9(derivation)
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how to shuttering is used in slab
What is meant by a context menu in a cad software?
What out turn civil works
what is the name of shuttering oil used in oman
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What does civil engineering mean?