Answer Posted / akram
L/B value is = more than 2 then these slab is Called as one way slab. in this slab the main Reinforcement will be providing in one direction.
L/B value is = Less than 2 then these slab is Called as two way slab. in this slab the main Reinforcement will be providing in both directions.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
what is the coefficient for running feet to cft coversion both area and price
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
How to make tiles floor step by step procedure?
Why should pumping be not used in case of concreting work?
what is the list of building construction equipment & teir output?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
i want texture painting pwd data
Differentiate first angle & third angle projection?
What is Curtailing of R/F
What is the exception critarea of cube?
what is the effect of duration of earth quake on framed structures ?
What is the purpose of the gap in the road on this bridge?