what is the consumption based planning ?
Answer Posted / shailesh patil
It uses the past consumption data to calculate the future requirement. It has no relation with the independent or dependent requirement instead it is triggered when the stocks falls below the reorder point or by forecast requirement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?
What is the production process in sap?
What is internal payroll process?
Where have we to specify the teardown time in one operation?
How mrp (material requirement planning) types are classified?
Explain source inspection.
What is the use of t-code cs20 in bom?
What are all the steps involved in Variant Configuration?
Explain the planning steps for 100 products?
How costing is affected the pp?
What is the uses of production scheduling profile and what the configure have you done current project
Can’t one material be assigned to more than one operation in a routine?
What is the use of QM control key?
Can we create production order without bom and routing ?