what is the consumption based planning ?
Answer Posted / shailesh patil
It uses the past consumption data to calculate the future requirement. It has no relation with the independent or dependent requirement instead it is triggered when the stocks falls below the reorder point or by forecast requirement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is routing in sap pp?
Standard mrp steps
What are the different type of BOM usage?
Explain LTP.
How can you get planned orders scheduled so that you can do capacity leveling ?
How do you do capacity planning ?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
What is sap pp?
Integration between PP and SD module.
What is known as 'demand management'?
Explain Kanban.
Difference between Manual reorder point and Automatic reorder point.
Scheduling times can be defined in the material master record by?
What is costing? How it is affected the pp?
Explain the mrp group and their uses.