what is the consumption based planning ?
Answer Posted / shailesh patil
It uses the past consumption data to calculate the future requirement. It has no relation with the independent or dependent requirement instead it is triggered when the stocks falls below the reorder point or by forecast requirement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is activity type and how it works in costing?
Explain the uses of the simple maintenance interface?
In sap-pp what are the costing parameters?
Explain the process of Material costing.
How to create PRT master record?
What is Schedule Margin key. How floats works in scheduling?
Why and how you calculate WIP?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is sap pp?
What are sequence, parallel, overlapping, splitting and where can we assign these
Which MRP types you have used?
Explain the mrp list and their uses.
Define standard cost
Integration between PP and SD module.
What happens to planned after it has been converted into production order ?