what is the consumption based planning ?
Answer Posted / shailesh patil
It uses the past consumption data to calculate the future requirement. It has no relation with the independent or dependent requirement instead it is triggered when the stocks falls below the reorder point or by forecast requirement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What do you mean by basic dates
What are the levels of batch, explain batch determination process?
Explain the uses of the simple maintenance interface?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
Explain what is sap pp?
What is costing? How it is affected the pp?
Difference between plan cost, Actual cost and target cost.
What is standard order type
How to create opbject dependencies in a bom for a configurable material?
List out the activities carried out in production planning?
Differentiate ‘variant bom’ from ‘multiple bom’?
What is planning file entry
What is group bom?
Explain Availability check.