Answer Posted / shailesh patil
sop-sales and operation planning
sop is a particular planning of material based on future forecasted sales and past history. controlling and profitability analysis (copa) provide future sales forecasted object and sales team provide past sales history based on this sop determine.
A rough planning is determine to check the availability of req. capacity and other requirement to carry out sop. The demand is transfer through plan independent requirement and execution is carried out for settlement of sop
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
Can’t one material be assigned to more than one operation in a routine?
How you get the ticket?
What is MRP Area or How can I excluede one storage location stock from MRP?
Mention what is the purpose of using capacity planning?
What is scheduling
What is costing? How it is affected the pp?
What happens to plan after it has been converted into production order?
What is the use of mrp group?
Explain In-process inspection.
Difference between plan cost, Actual cost and target cost.
What is Schedule Margin key. How floats works in scheduling?
How system calculate the actual cost?
Explain why their is need of production version ?
Standard mrp steps