Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many numbers of Precast concrete hollow blocks (400mmx200mmx200mm) can be installed by the one mason and two helper in one day.

Answer Posted / honnikery-007

one mason and two helper can install atleast 125 numbers of block per day

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Prepare a Schedule for a Highrised building from starting stage to Handover?

1967


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6737


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2109


What is componsation

2166


What is command line?

1164


though u r a civil engineer, y r u interested in tcs???

2571


How do you calculate the power of centrifugal pump?

1114


What is diversion tunnel in a dam?

1220


Is it possible to make a feature using an overdefined sketch?

1364


TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

2153


in design case of structural member best suitrable percentage of steel limit is what

1503


Define What is the origin of name Railway Sleepers?

1267


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2849


Define What is unit weight of normal concrete?

1274


Consumption of Binding wire for fixing of cover block in vertical surface

1496