Answer Posted / honnikery-007
deshuttering time for long span 21 days
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is the difference between absorption & adsorption and sorption?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
what is the mix design for M:60 with micro silica andmetakaoline?
The definition of national highway
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
how much used soil in 1 brick of standard size?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
whats is difference between anchorage length and development length
how is the reinforcement is distributed in triangular slab
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
hi guys what happens if you are absent for a supplymentry exam?