why we do multiply 1.54 for dry volume of concrete?
Answer Posted / subhas bera
This is experimental value we dont calculate accurate value.it is assume for 1m3 conc when we convert wet to dry 1.64 is multiply. Cause some vol of conc is reduce and some wastage it is may be not.
| Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
Describe Briefly The Various Methods Of Concrete Curing?
Where is the worlds longest elevator and how long is it?
What is meant by autocad?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
How to make a c++ program that converts any base to base 10?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
Explain the different types of building contracts?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Are cruise ships built for the transatlantic run?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
how to calculate valuation for the old building?
What is the biggest dam in america?
What is the tallest man made structure in the world?