What is PQC. Means PQC
Answer Posted / mani kumar
PQC preferred where the soils are poor so as to avoid subgrade and earthwork.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
what is pile and deam foundation
procedure for preliminary selection of size of column of 5 storey building
how to calculate number of bitumen for road asphalt
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is a kip?
Critical Path Method is...
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)