Need help. 3 phase system. Neutral line arced and melted
upon connection of connector with 3 phase power. Why would
that happen?
Answer Posted / francisjohn
Check the neutral wire is loose condact
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is voltage ratio of a transformer?
plz tell me,ht and lt panel terminals in substations explain beiefly
What is the technical difference between On delay timer and a Star delta timer?
Terminal blocks is used for segregate the connections... There is any principle for terminal block..?
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
how much LT load can bear by the 100 KW HT connection.
WHAT IS THE TOTAL POWER GENERATION IN CHHATTISGARH?
What is the difference between a 3 winding and 2 winding Potential Transformer
what is the interrelation between voltage current torgue speed and magnetic flux in case of different types of electric motors
State the methods of improving power factor?
sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.
what are the different methods for the starting of a synchronous motor.
Can we check ELCB constantly from R1 to R8 phase in 1 no DB?
As an electrical engineer what are the responsibilities which i can hold in TCS?