how to remove duplicates in transformer stage by using
stage variables?one example?

Answer Posted / peeyush sehgal

sv1=inputlink
sv2=if inputlink=sv3 then 1 else 0
sv3=sv1

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1)what is the size of Fact table and dimension table? 2)how to find the size of Fact table and dimension table? 3)how to implement the surrogate key in transform stage? 4)write the configuration file path? 5)how many types of datasets explain? 6)diff b/w developed projects and migration projects? 7)how to delete the header and footer file of the sequencer file? 8)how can u call the parameters in DS in unix environment? 9) how much data ur getting daily ? 10)

2309


how to get sum of sal based on dept_no and then sum of all sal irrespective of dept_no in same sql. output:- 10, 200(sum of sal for dept_no 10), 5000(sum of all sal)

521


How one source columns or rows to be loaded in to two different tables?

655


Which is the best institute in Hyderabad to learn OBIEE and DataStage?Please tell me faculty name also

2741


Define ds designer?

766






what is flow of project?

1557


What are the some differences between 7.x and 8.x version of datastage?

737


How will you move hashed file from one location to another location?

1654


What is oci?

850


What is the importance of the exception activity in datastage?

619


file having these input and we have to get 3 output using same job Input 1 1 1 2 3 4 4 4 o/p1 o/p2 o/p3 1 1 2 2 1 3 3 1 4 4 4

534


Define repository tables in datastage?

699


if i have two tables table1 table2 1a 1a,b,c,d 1b 2a,b,c,d,e 1c 1d 2a 2b 2c 2d 2e how can i get data as same as in tables? how can i implement scd typ1 and type2 in both server and in parallel? field1 field2 field3 suresh , 10,324 , 355 , 1234 ram , 23,456 , 450 , 456 balu ,40,346,23 , 275, 5678 how to remove the duplicate rows,inthe fields?

1743


In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?

1040


What is datastage engine?

728