How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / kanheya lal
footing by structures weight formula in steel dia for load
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Formula for calculating the volume of bulb in underreamed pile
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
how to workable concrete cube test M-25 design mix
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
Which are the Steel tests ?
Detection of a beam & a girder areββββ
How to calculate canal slope curvature qty!
1m square 20mm plastering how much of water need curing work
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What is meaning of FREE STANDING STAIRCASE ?
difference between fc and fc'?
In a concrete grade C35A, C & A stands for what and equalent cube strength?