After synchronizing the running generator with grid, the avr getting tripped and the generator breaker also oettong tripped, before tripping the avr the pf meter of generator is showing leading pf please kindly give a suggestion to rectify this problem.
Answer Posted / k.prakashchandra
As told by somebody , the phase sequence in the AVR should be as that of gen
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.
xfhnchncv?
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?
Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??
whats the application of voltage regulation? and whats the voltage regulation's device?
What is the Temperature to be set in Thermostat provided in Marshalling box of the Transformer / Motor.
Advantage of LT panel vs HT panel
i have interview in Pepsi company what type of question will ask please send the question and answeer
george phenomenon of synchronous machine
what is the synchronous timer ? and it applications.
State thevenin’s theorem?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
how to calculate the torque of a motor?
what is the importance of Partial Dischage test for Electrical Equipments
are there rmu for 3 transformer?