How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.
Answer Posted / nadim abdulgafur shaikh
its 33% of total brick or blockwork
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is that one cub metre plaster in cemant and fine sand
How can i do RCC rate analysis?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how to find ssm in foundation?
what else we can add rather than admixture in concrete to reduce the cement quantity?
what is high type road and low type roads
Name the main components of a cad gui?
How will you Engage Labours on Site?
How to get MEP technical,instaaltion & testing data for interview?
(Project Management Topic) What are the important criteria in the successful realization of the project?
Define aligned dimension?