How to calculate cement quantity in m20 concrete
Answer Posted / jayaprakashsst
M20 concrete means 1:1.5:3
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 bags
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
what could be the production cost of 1 cum of concrete by CP30 plant
What is the different type of slump test indications?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
what is the specific gravity of rubble in plum concert
Describe the role of independent Quantity surveyor?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
In earth work 1300 cum soil how to calculate how many liters require in water
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
what is features of a typ-ical modern air-conditioning installation?
Can we apply curing compound on ceiling (slab Bottom)
400 ku d/c clearess ketan hota hai?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now