how costing is done in pp or how u will know the cost of a
product which is manufactured in ur plant
Answer Posted / rashmi kant
Ist we estimate the material in t-code CK11N
THEN we do costing of the product in CK24
T-code CK4ON can be used for group costing.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is mrp list and what is the use of it?
What is testing & explain standard testing
Explain the mrp list and their uses.
Difference between standard cost and variable cost.
Explain the planning steps for 100 products?
Explain what happens to planned after it has been converted into production order?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
Explain the Difference between the Discreet and REM.
What are the types of master views for production and planning?
Explain why there is need of production version?
How do you get the system to update this value from the routing?
How to insert an inspection checkpoint at the end of an operation?
How can you get planned orders scheduled so that you can do capacity leveling ?
what are the settings needed for variant configuration?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?