Why tyres are manufactured in black colour?
Answer Posted / lavanya l
since, the black carbon is mixed with the materials added to manufacture tire. it looks black.In addition to that, black surface absorbs more radiations which may increase the strenth of the tires.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What are the procedures in paralleling D/G?
Explain why diesel engine is known as high torque and petrol engine as high speed engine?
Who invented the four-stroke engine?
how to calculate the size and weight of induced draft axial fan impeller
What is wet corrosion?
What are the benefits of cycloidal gears?
Specific strength of materials is very high when they are in fibre size but lower when they are in bar form why ?
What is vane diagram in centrifugal pump?
List at least two factors that promote transition from ductile to brittle fracture.
What is blading efficiency of steam turbines ?
What is ps?
i am studying in bechanical engineering in M,S,University at Baroda.i and my friends want to take one month industrial trainning in mechanical engineering company.pleas send some company's name and procedure.
What is control volume system?
material grade c 45
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb