what is the right method of laying cable tray if we are
using EOT crane in shed, better is below or up
Answer Posted / sufiyan
Definitely if you are using EOT crane then the cable tray must be installed above the height of cross travel of that crane + 0.5 mtr for safety
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How generating electric power export to grid from the generating station ?
Why the magneti fields are not passes from southpole to north pole
How to do cable sizing calculation for 750 A Neutral Earthing resistor for 33kv. the 33kv cable going to swbd. is 630mm2 3 runs.
why we are using earth pit in sub stations.?
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
from which subjects most of the technical que will b asked for hpcl(electrical).pls help me
Why negative feedback is preferred in the control system?
what is sustainable current of any conductors . a bare busbar or pvc cable has different sustainable current .
how to electronic energy metter failed in electomagnectic fild passing in the metter and which thing to defect more on metter.
What is routh hurwitz stability criterion?
Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.
Explain different types of d.c motors? Give their applications
electrical
current transformer balance the power level on both sides. e.g in case of step up, at secondary side voltage rise but current decrease and vice versa in case of step down transformer. but how this power level remains same in case of current transformer and voltage transformer
What are the relays in ACB and VCB