What is SCADA ? WHAT is it role in DCS ?

Answer Posted / it training center in noida (a

The first difference between the two is that DCS is usually a process oriented in contrast to SCADA, which is data-gathering oriented. DCS scans and concentrates on the controlled process, be it, a chemical plant or any other and presents the information to the operators. SCADA, on the other hand, concentrates mainly on the control centre as well as the operators. The remote equipment is mainly used to collect data even though it can be used to carry out other multifaceted process controls.

A DCS operator station is usually linked to its I/O via the local wiring, networks and FiedBus. The operator makes a request directly to the field I/O whenever he wants to get information and gets a response for the same. This means that field events can directly disrupt the system and counsel the operator. On the other hand, whenever field communication fails, SCADA has to operate reasonably. Its main concern of a SCADA system operation is the quality of the data that is shown to the operator. In short, a DCS system is principally concerned with the process trends while a SCADA system is driven by the process events. for more information visit website : http://aptronnoida.in

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

List three types Level Gauges with their working principles

1641


List three types Level Switches with their working principles

1623


How to Calibrate Level Troll in field

767


What is the principle of capacitance type level transmitter?

673


Galvanizing.

1469






Identification of control valve parts.

1531


Difference between 2-Valve Manifolds, 3-Valve Manifolds and 5-Valve Manifolds 3 with diagram

2684


Speedtronic system .

1535


What is the exact differences between HART,FOUNDATION FIELDBUS,PROFIBUS?

3003


How many types of sensor

1161


Calibration procedure for water rotameters

1751


Working principle of magnetic flow meter ......and calibration procedure of e+h magnetic flowmeter...

1897


why would you like to join our company

883


How to decrease opening & closing time of on/off valve?

971


I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.

1364