If 16 mm dia hysd bar of grade Fe500 is needed in a beam but it is not available in the construction site but the beam has to cast in an emergency. Which dia of bar is to be used for for that situation? (If greater than 16 dia bar is not available at site)
Answer Posted / kalyanqaqc@gmail.com
12 mm dia bars may be used and no of bar to be adopted after calculating area of steel required as per drawing.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
Why steel rods are produced only in even dimensions?
How will you reduce the concrete flow after mixing the concrete
What is the software used in civil engineering?
How to testing voids of filled aggregate in bitumen mix design
How do you compute the volume of airflow?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
how much used soil in 1 brick of standard size?
reinforcement slab, beam and column formulas?
What quantity of 1.0 m3 bricks required?
how to calculate rate analysys of 1:6 plastering 10 sq m
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What is meant by a context menu in a cad software?