Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?

Answer Posted / ashok sharma

If we Consider 12 mm thick plaster(1:6)

Area for Calculation=1M x 1M = 1 Sqm

Quantity in Cum.=1M x 1M x 0.012M = 0.012 Cum.

Proportion of Cement = [1/7=0.143 x 0.012=0.002 Cum/0.035 x 50 = 2.45 K.g

Add 25%+5% [Dry volumn + Wastage] =[ 2.45 x 30% = 3.18 K.g]

Proportion of Send = [6/7=0.857 x 0.012=0.010 Cum x 35.32 = 0.363 cft

Add 25%+5% [Dry volumn + Wastage] =[ 0.363 x 30% = 0.472 cft]

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

2241


What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?

2115


What are advancements in civil engineering?

1067


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

2632


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

1668


Define line type?

1124


hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard

2106


Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000

1740


What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2577


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

2376


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2359


What is the quantity of cement in mix m20 concrete?

1173


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1591


what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

5222


Are cruise ships built for the transatlantic run?

1265