How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?
Answer Posted / ashok
If we Consider 12 mm thick plaster(1:6)
Area for Calculation=1M x 1M = 1 Sqm
Quantity in Cum.=1M x 1M x 0.012M = 0.012 Cum.
Proportion of Cement = [1/7=0.143 x 0.012=0.002 Cum/0.035 x 50 = 2.45 K.g
Add 25%+5% [Dry volumn + Wastage] =[ 2.45 x 30% = 3.18 K.g]
Proportion of Send = [6/7=0.857 x 0.012=0.010 Cum x 35.32 = 0.363 cft
Add 25%+5% [Dry volumn + Wastage] =[ 0.363 x 30% = 0.472 cft]
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how to calculate the scour depth
Volume of 25kg putty bag & 40 kg putty bag volume??
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
What will you do if you encounter problems like accidents?
What are your future hopes for this job?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
What is the ideal size of the living room ranges from small to large size?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
The portion of a brick cut across the width is called?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
How much material is required for constructing a 2 Lane 2Km rigid pavement road
Explain major differences between routing maintenance and major maintenance.
what is project?