What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / b m sarwe
Beams 21 days
beams side 1 day after casting
slab 7-14 days
columns 1 day after casting
wall 1 day after casting
footing casting next day
Deshuttering works
Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
what is floating slab foundation?
What is Time period of a building and its relation with frequency ?
how to calculate the steel in 500yard
Explain what is the difference between built area and super built up area?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
what is the Asfalt test?in road constraction..?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
What is Rankine Cycle?
Scaffolding IS code NO.
what is the formula for Mass of cement grout (Dg)=???
what is raft foundation
pls mail some more tecnical qustions at msaranya2610@gmail.com
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is alternate bid?