Beams 21 days
beams side 1 day after casting
slab 7-14 days
columns 1 day after casting
wall 1 day after casting
footing casting next day
Deshuttering works
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
What are wooden shingles?
How is make concrete cube?
What is the release of lien?
What is Architect-Prepared Contract?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
how do you stabilize a waterlogged area in road construction
is concealed wiring a problem in fly ash brick wall?
Doul Bar reinforcement and details of drawing.
IS code for Rolling Margin of steel
how to tie 10 legged stirrups
Which purpose we use deck anchor in bridges?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
What are the alternate material for steel, Sand and aggregate
60-70 grade of Bitumen is VG-30 ?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?