How to schedule counter base maintenance plant for DG in
power plant that need 800hr per month maintthis
steps i followed.
1)i have created meas pt with counter (IK01) created meas
document IK11 then schedule thru IP10.
but not getting due order list in ip24.
can any one help me by telling exact cycle.
thanks in adv.
Answer Posted / kalyan
please check the scheduling period for counter plan
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
When do you perform breakdown maintenance?
You want to find out all the tranparent tables related with sap-pm module. How will you do that?
What must you do if you have assets (functional locations) with the same number in several plants?
What is a technical object in plant maintenance?
What is structure indicator?
What is the use of the field “standing order”?
You want to control the sap pm order type. How would you do that?
explain teco?
What is the business purpose of field authorization object in equipment master and functional location master?
Explain the integration points between pm and mm/fico during the pm configuration?
Which equipment category is used to represent laboratory equipment?
What is purpose of offset entry in single cycle maintenance plan?
Which task lists are object based?
You tried to install an equipment on a functional location but system gives you an error. What could be the possible reason?
Is maintenance strategy mandate for maintenance plans?