whike making bbs we deduct 2d for every bend in bar but theoretically we cant subtract 2d for every bend and for every dia of bar , so plz tell me the exact deduction for bends for different dia of bars and for different angles ??
Answer Posted / jonah
2d is correct increase but during subtraction 1d is to be subtracted as the increase in dia is for one bend.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to design and calculate materail quantity for concrete speedbreaker ?
what is cross hair cursor?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how to caluclate sienerge qty in construction in ap
What is costing in 100squre feet bricks
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How can i display 5 asterisk and another 5 asterisk )?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Define What are the reasons for geotechnical site investigations in Uganda?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
very simple or less time consuming formula for reinforcement calculation by moment
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.