What"s mean by term of BOQ in construction?
Answer Posted / n.sasikala
BOQ is prepared by the assistent engineer
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is Base Shear ?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Define What is the meaning of a blue land surveyors flag?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is the cost difference between site mix and ready mix concrete per cubic meter
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
How many axes do cartesian coordinate system has?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
Which type of plywood & sizes using in construction projects ?
Slab quantity
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
What are the causes of building collapse?