In subcontracting process, BOM is created for a material.Though PO created for same material,BOM do not trigger in PO, why?
Answer Posted / ragi
U have to explode the bom from t code me21n in material tab
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What is difference between gr blocked stock and blocked stock?
What is the difference between cbp and mrp?
Explain how is the vendor return processed without a purchase order reference?
What is the procedure to make the source list automatically appear in material master as default if maintained at plant level using ome5?
What is the sequence of determining the vendor : quota arrangement, source list, pir, old po. Arrange them in right sequence.
What is the quota arrangement?
Explain what is sap mm?
What is the organizational structure in the mm module?
What is the interaction between sap mm and sap abap consultant and how does they interact?
What do you understand by posting period?
What mrp procedures are available in mm-cbp (consumption based planning)?
Why is batch record important?
How is scrap material taken care of in sub-contracting?
With which modules in sap is the inventory management integrated?
What is a material ledger?