Cemen-1
Fine agr.-2
Core agr.-3
calculate for per 100 qube feet (qubic feet wise)
Answer Posted / engr saleem mughal
Total Quantity=100 Cft
Dry Material for 100 Cft=154 Cft
Ratio=1:2:3
Sum=6
Cement=1/6*154=25.66 Cft
Sand=2/6*154=51.33 Cft
Crush=3/6*154= 77 Cft
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
Formula for calculating the volume of bulb in underreamed pile
how to conversation of all construction material in to brass
Define What is rigging?
howto calculate the quantities of material used in fly ash brick after finding the volume??
IS code for Rolling Margin of steel
What are the techniques to measure road difference?
how much cement and sand required for 1cum rr masonry
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
How to calculate unit weight of concrete for m40 grade.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
Which Types Of Bricks ?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?