How you will define background job? Which job class used?
Answer Posted / imran khan
Hi All,
To Define a Background job use T-code SM36.
By Default Job priority will be C.
We can change it to A(high),B(Medium),C(Low)
We then have Spool recipient Option and Target system option.
I hope this Helps!!!
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How many types of work processes are there in sap ?
Mention the use of personalized tab and parameter tab in user master record?
Explain segment?
How much swap memory should be in the system?
what can we do if shadow instance is down and getting up in prepare phase of upgrade
1)Have you used performance tuning? What major steps will you use for these? 2)In production what is the user exit? 3)What type of user exits have you written? 4)Difference between Search Helps and Match Codes 5)On which even we can validate the input fields in module progams? 6)what are the table controls in BDC ? 7)what is the difference between bdc and lsmw ? 8) If the scripts are client dependent, what above driver program ? (client dependent / independent) 9). I have two pages, In one page I want address, Header, Main & footer. In the second page I want only Main. How to do it? 10) Will 50,000 records be uploaded directly into APP's Server? 11) What is the button to change the variant in ALV ? 12) If your project is support project ? when is your implementation has completed ? 13)In start of selection, if we perform validation, what happens ? 12)How to join 3 tallies & looping. We have developed a program in a client say (200- client) and 210 has test data. No developing rights. How to test data? 13)How to transfer data which is coming from are report as output to another report 14)How to create standard text and how do u transfer it ? 15)What are the views when we are creating Material ?
What is sap netweaver administrator tool?
What is a background processing batch scheduler?
Where can you find a list of object keys included in a transport?
What is the different architecture between SAP 4.7EE & ECC5.0
I am installing a sap j2ee engine at crm. When it reaches phase 22 it halts for more than 10 minutes and gives up starting the system. What should I do?
How to transport objects from Production to Development?
Is sap a database ?
What is the difference between Party & Service without party in XI (ID)?
What is a support package? What is its purpose?