Answer Posted / chowdary
Following steps should be performed/checked before starting client export/import:
Export User master data for this specific target client.
Export logical systems & logical ports of specific target client.
Ensure enough database space is available for client copy on target database..
Ensure no user activity on source system. (Lock system for client copy).
Ensure Log backups frequency is set to meet the requirement and avoid log space being filled completely for both Target & Source System.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
can anyone tellme java instance startup sequence?
If possible send me screenshot doc for installation of ecc6
describe where they would look at the buffer statistics, and what steps they would use to adjust them?
Explain what is the purpose of tdevc ?
Have you done any parameter changes using configtool and visual admin tool?
User wants lock ASAP then what will u do?
How to deactivate IPC in standalone CRM.
How you will rate yourself in SAP, Oracle from a scale 1 - 10?
What is an “ok” code is and what is the difference between “t-code” and “ok” code?
When I check transaction sm37 and I want to see the spool I get a message that says "no list available." Why is this?
I also wanna work with Webdynpros? What are the requirements? I mean SAP 4.7 ee or ECC 5 or 6? Netweaver developer Studio? Also with win 2003 i have the activation problem every month. SO do i get a cd that doesnt ask for the activation? i have win 2000 but can it be installed on HP pavilion laptops that are coming preinstalled with Vista OS?
Where can you find a list of object keys included in a transport?
What is JVM switch. Why JVM switch is required ?
Where XML file is generated in solution manager?
What is the use of commit value while deleting jobs in sap system?