I have a single cycle maintenance plan that is triggered by
a counter assigned to a equipment A. If I replace equipment
A with equipment B how do I change my Maintenance plan
counter? When I use IP02 "change maintenance Plan" the
counter box is greyed out. Thanks for any advice.
Answer Posted / mahendra
Create a new counter and plan for equipment b
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Do we need to run this transaction code ip30 for all the maintenance plans which are scheduled on regularly daily basis or weekly basis so that if any scheduled object exists then it will get converted into the service order ?
Can we change equipment category once defined?
What steps must be defined in customizing for alternative labelling?
A reservation is triggered from a maintenance order and user is trying to issue material from warehouse with reference to the reservation. But system is not allowing goods issue? What I need to check?
How to configure system to allow notification type change?
What is sap plant maintenance?
How do you distinguish, in a simple manner, between equipment that is being charged and not charged for service?
What do the mb31 tcodes in sap- pm mean?
What do the qs42 tcodes in sap- pm mean?
You tried to install an equipment on a functional location but system gives you an error. What could be the possible reason?
For an equipment master record what fields need to be filled in?
How will you make a field mandatory in maintenance notification for a certain notification type?
Differentiate between work center and main work center.
You want to show equipment's characteristics in a list. How would you do that?
What is sap pm ?