1.challanges in project? 2} landscape of project?3}How schdule line determined? 3}whst is shelf life exp? 4}fields to be maintained in Material master for TOR & availabil check.?
5}Third party business process,if 100 order 90 del by third how to bill for 90 how to configre this ?6} what is the tax procedure used in project? 7}account assignment done ?8}whatis alt cal type ? 9} How many pricing procedure you used? 10}What is condition exclusion group & exclusion indicator ?difference bet rush order & cash order?

Answer Posted / chandra mouli

2)Landscape of project:
Landscape means arrangement of Servers.
Here, Landscape of project means it depends on your project how the landscape is designed.
SAP suggests 3 servers. They are: Development server, Quality server and Production server.

3)How Schedule line is determined?
Schedule line is determined based on MRP type and Item Category.

4) What is Shelf life?
Shelf life: These two words itself explains that it gives the details about expiry dates of a material.

5) Fields to be maintained in Material Master for Availability Check and TOR?
first,Let us know the pre-requisites of Availability Check and TOR
For Availability Check:
1)Availability check should be maintained at sales general plant view in Material Master
2)Availability and requirement should be checked in schedule line category controls
3) Availability and requirement should be checked in requirement class and
4) Requirement type should be determined into sales document. Requirement type is determined based on Strategy group,MRP Group and item category+MRP type

For TOR:
Points 2,3 and 4 which are mentioned above are the pre-requisites for TOR.

Now, Fields to be maintained in Material Master for Availability Check and TOR.
Maintain Availability check field and (Strategy group or MRP group or MRP Type+item category) in material master.

If you want requirement type to be determined from SD then maintain origin of requirement as 1 in TOR configuration steps

6) Third Party business process, if order--100 but delivery--90.How to bill for 90 & how to configure this?
Maintain Billing Relevance in item category control should be F, Billing Quantity should be F in copy controls and Copy requirement should be 012.

9) How many pricing procedure you used?
It purely depends on your project(client business process) to decide how pricing procedure to be maintained.
For Indian clients:
Domestic pricing procedure, Exports Pricing procedure, STO pricing procedure and Depot sales pricing procedure.

10) Exclusion Group: This concept is generally used to pick the either the best or least condition types to get triggered into sales document.
Exclusion: If you maintain exclusion in your condition type the below condition types will be eliminated which are having the same requirement.
You can maintain exclusion in 2 places 1---> at your condition type control and 2---> At condition record level.
If you maintain at your condition record level then it is applicable only for that record which will not affect other condition types.

If you want to use exclusion group concept then uncheck exclusion at both the places i.e.., at condition type level and condition record level.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Does sap transportation management support optimized routing and last mile planning? : transportation management

623


how we will configure export sales in sd (respect to plants assign and sales process)?

587


Once you create a sales order, how do you confirm to the customer like I have the stock for ATP to check for the customer?

295


Dear Gurus, Can u please post some real time tickets with solutions and what are the different tools used in Support SD consultant and their team size

1808


How have you used MASS tool in your last project, and to upgrade what data?

1540






Hi, Can anyone proivde the soluiton for the below senirio, thanks in advance. We are providing test services to various sites of a corporate. Now, we want to bill as a single bill point i.e. Corporate office. Single bill for each site will be generated. E.g. Panac Labs, New Delhi Head Office Panac Labs, Mumbai Lab at Mumbai Panac Labs, Kolkata Lab at Kolkata Panac Labs, Indore Lab at Indore In above case, we are cattering services to all four locations. However, New Delhi is the Head office and Lab too. Hence we will issue four bills addressed to Panac Labs, New Delhi. Outstanding and debtors will be maintained on A/c of Panac Labs, Head office. We also want to maintain sub- ledger base on sites

1657


What about your experience with EDI idoc, can you elaborate a bit of what’s your experience working with EDI and IDoc?

520


what is consignment stock process?

692


Define tax determination rules

693


Hi Experts,Is SAP Solution Manager an inbuilt software within SAP System or do you have to purchase it from outside?Please answer this question asap.... Looking forward for your express reply...I have interview within 1-2 days. So, give reply to this query asap.. I would be very grateful to you for your timely help.Thanks in advance. Regards

1643


How we can do invoice split depending on item category in which scenario we will use?

636


What are the influence factors for account determination for invoices?

579


what is access key? how it is obtained? i was asked access key while creating data transfer routine

1625


Hi, Im ramesh. I have a question. Generally in Interviews interviewer ask about companies(clients) business process. I put an implementation project in my cv. Client is Chemical Industry. What is the business process of a chemical industry genrally. Pls answer me anybody. Thank u.

1518


Which partner function realent for credit limit?

787