Answer Posted / manish kr
Due to priming or galvenising steel doesn't make perfect bond with concrete so we avoid this
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
at what pressure ply-wood is obtained by gluing wooden sheets
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
What are the different types of foundation?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
In case if concrete box girder bridges how is the number of cells determined?
How much cum. Brick work can do by 1 madon
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
what is the difference between prime coat and tack coat in road construction
For a washout valve why are two gate valves required in normal practice?
How can i do RCC rate analysis?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
How can I make justification between using concrete grade c35 compare c37?