how is the wastage component in structural steel being
considered while doing the reconcillation for the
fabrication with returning of scrap under 1 meter length
Answer Posted / naresh
3% is the Wastage and 2.5% is consider out from this,0.5 goes to non consider that is cut and waste.
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What are the different approaches in designing the floors of the service reservoirs?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
Define What is a kip?
What is the strongest bridge for a school contest?
Floor tile measurement? Wall to wall or skirting to skirting
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
how many time use of plywood shuttering and IS code
What are the methods of measurement? Describe it shortly
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
List out some of the common problems that architect have to tackle it?
how to shuttering is used in slab
What is Heavy Concrete & Normal Concrete
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)