how is the wastage component in structural steel being
considered while doing the reconcillation for the
fabrication with returning of scrap under 1 meter length

Answer Posted / naresh

3% is the Wastage and 2.5% is consider out from this,0.5 goes to non consider that is cut and waste.

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1701


What are the different approaches in designing the floors of the service reservoirs?

754


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1365


Define What is a kip?

720


What is the strongest bridge for a school contest?

706






Floor tile measurement? Wall to wall or skirting to skirting

1365


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

36334


how many time use of plywood shuttering and IS code

2684


What are the methods of measurement? Describe it shortly

1772


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1486


List out some of the common problems that architect have to tackle it?

632


how to shuttering is used in slab

1311


What is Heavy Concrete & Normal Concrete

2232


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2107


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3251