Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if suppose boiler has high heavy tube leakage, so in which time we feed the water in a boiler. can we stop the feed water at particular combustion temperature.

Answer Posted / alok bhattacharya

When boiler is steaming, only then leak will develop because of steam pressure and faulty tube part. Now in case of heavy tube leakage, boiler must be stopped immediately and maintain drum level in order to avoid starvation and further damage of tubes. Moreover boiler need to be depressurized simultaneously.

Thanks

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why airtel use + 24 volts and other operators use -48 volt

2692


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2357


what is the difference between compensated & normal drum level in boiler drum?

1860


what is the basic use of power plant in equipment

1841


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2471


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2471


How to calculate power press toneage

2129


Why superheated are started before I'd and rd fan?

2227


What is difference between secondary Air & Tertiary Air and Their use.?

2062


How We Calibrate the vaccum transmitter?

2019


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2606


By any way can we increase the B check hours from 300 to 500

2254


LAPT working in alternator / generator

3694


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1793


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3311