How much binding wire required in 1 MT Reinforcement?
How much Nails Required in 1 Sqmtr Area work progressed
Answer Posted / sohan jaswal
For 1mt of steel, 8 to 10kg of binding wire is required.
Fir 1sqm of shuttering- 100 to 150 gm of nails are used.
| Is This Answer Correct ? | 16 Yes | 0 No |
Post New Answer View All Answers
What is missing report and how to prepare
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
What is Time period of a building and its relation with frequency ?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What is the difference between EPC,DBOOT and BOOT.
Define different types of roof systems?
i need gate exam civil engineering question papers with answers
how can we calculate steel value, depending on load
Define graphics window?
where can i get the previous question papers for rrb section enginerr (civil)
afe or not
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)