1. how Product Cost Collector Works?
2. What are the master data for MRP?
3. In a production order without making goods issue, i should
not be able to do goods receipt. How do we do it?
4. i have one particular part 'A'. it is available in two
storage location X & Y. when i run MRP, I don't want MRP to
consider stock that are available in storage location Y. what
should be done.
5. for in-house production, planned order are generated & for
external procurement purchase requisition. i want, system will
go in external procurement to a particular vendor. what is the
setting?
6. what are the problems you faced in MRP?
Answer Posted / hayat khan
1. It captures all Dr and Cr related to the GR and GI for the respective material.
2. MRP controller, MRP controller for missing parts, PPC calender, Shedule margin key, MRP area, MRP type, Procurement tYPE, SPECIAL procuremement type etc
3. In confirmation parameters set indicator "termination for incorrect goods movement"
4. set MRP indicator 2 in MRP4 view for storage location Y
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is Backflush, the places where the backflush is used?
What is phantom item & sub contracting
What is the production process in sap?
Mention what is the production process in sap?
One component we can assign to workcenter at routing
how many times pcc can run for one material?
How can you get planned orders scheduled so that you can do capacity leveling ?
How do you integrate HR (employee) with PP?
What is mrp controller means?
Explain Flexible planning Procedure?
How do you do capacity planning ?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
You want to insert an inspection check point at the end of an operation. How would you do that?
what are Standard keys
What are the t-codes for creating, changing and summarizing bom?