What is mean concrete class c35/20. Here C35 and 20 means?
Answer Posted / vikranth geddam
please refer BSEN206.
page 20, table-7.
we have two different cases here.for example for C35/20,
35 is characteristic strength or grade or crushing strength and 20 is aggregate size.
how ever, when u refer to BSEN 206,it says 35 is minimum characteristic cylinder strength and 20 is minimum characteristic cube strength.
Is This Answer Correct ? | 15 Yes | 7 No |
Post New Answer View All Answers
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Explain how you can turn off the display for dimension in CAD?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
Detection of a beam & a girder are––––
What is made from large rocks, which protects the base of cliffs?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What is meant by solid geometry?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
why the openings of sieves are square io size?
Sir how to find cutting length for footing steel bars in the shape of "u"
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need