What is the permissible limit of silt contain in sand for rcc
Work?
Answer Posted / rajesh kumar jha
by wt. method 5% below
by volume method 8% below
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
plz.show development and anchorage length in simple diagram.
What is the per cu. mt. price of ready mix in Gujarat region.?
please send me bhel questions on rupesh.017@rediffmail.com
water leak detection system question & answer
what is the difference between replacement of cement by groundnut shell ash
HOw much % of premium on DSR-2013 currently
Technical Question of Civil Engineering
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
what is the 0 value in quantity surveying
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
What is Density of cement, sand & aggregate ?
VAT and CST ? Which benefits for buyer ? Why benefits?